In the words of the electrical inspector: "It was all looking great until we got here (the bathroom)".
Basically, the entire basement looked good to him except the bathroom needs to be on its own circuit. It shouldn't be too bad to do because I don't have to really disconnect much - I just need to run a new cable from the service box and hook it up to the existing entry box in the bathroom. The main downside is it'll take a little more time and I need to call him back to have him inspect the work again. It could have been a lot worse though :) I'm just happy that this milestone has been reached and that I know where I stand for the electrical work.
So, this weekend I hope to get those changes made and have him come back on Monday or Tuesday.